DC Development Service

DC Development Service
Site Development
The prerequisites of site selection for Enterprise
customers are based on stable scalability. Colocation
Provider determines the appropriateness of
the site by reviewing the feasibility and
geographical/physical risks of the project, focusing on the core
regions where the customer’s demand is high.
Through cooperation with real estate developers and data
center design firm, major issues necessary for the
development as initial licenses, sites,
regulations, and laws and the intention to move in as major
target customers are confirmed.
customers are based on stable scalability. Colocation
Provider determines the appropriateness of
the site by reviewing the feasibility and
geographical/physical risks of the project, focusing on the core
regions where the customer’s demand is high.
Through cooperation with real estate developers and data
center design firm, major issues necessary for the
development as initial licenses, sites,
regulations, and laws and the intention to move in as major
target customers are confirmed.
Data Center
Design
Design
We conduct professional data center consulting service
through the selection and collaboration of design firm.
In the data center design phase, various technical
requirements such as Uptime Tier criteria, OTT/CSP Global
Standard, and WUE/PUE must be met, and potential customers
must be selected to calculate target load and capacity per rack.
Considering the size of the site and all requirements,
we will discover major issues and review alternatives for
each concept/basic/implementation design
stage. During the design consultation, various issues
are quickly discovered and design plans are drawn up to
reduce development risks and achieve economies of scale.
through the selection and collaboration of design firm.
In the data center design phase, various technical
requirements such as Uptime Tier criteria, OTT/CSP Global
Standard, and WUE/PUE must be met, and potential customers
must be selected to calculate target load and capacity per rack.
Considering the size of the site and all requirements,
we will discover major issues and review alternatives for
each concept/basic/implementation design
stage. During the design consultation, various issues
are quickly discovered and design plans are drawn up to
reduce development risks and achieve economies of scale.
Data Center
Construction
Management
Construction
Management
In the construction stage, various issues occurring in
core infrastructure facilities are identified, and
construction error verification and quality
are secured in stages through collaboration with PM/CM/CxA.
From Factory Test to Installation and Integrated
Commissioning Test, continuous monitoring and verification
will be conducted to ensure that the DC design is properly
constructed on-site throughout the entire process.
After completion of the verification, the initial
operational policies and basic operational plans
specialized in the center will be established before the
Hand-over procedure is carried out and the customer moves in.
core infrastructure facilities are identified, and
construction error verification and quality
are secured in stages through collaboration with PM/CM/CxA.
From Factory Test to Installation and Integrated
Commissioning Test, continuous monitoring and verification
will be conducted to ensure that the DC design is properly
constructed on-site throughout the entire process.
After completion of the verification, the initial
operational policies and basic operational plans
specialized in the center will be established before the
Hand-over procedure is carried out and the customer moves in.